Skip to content

Repair work Friday night on Taylor Bridge

Single lane alternating traffic; expect delays
Taylor Bridge
Taylor Bridge looking south | Dave Lueneberg

Dawson Road Maintenance will be conducting routine repairs to the Taylor Bridge starting Friday evening, Jan. 21 beginning at 7pm.

Work is expected to continue until 3:30am on Sat., Jan. 22. 

During this time frame the bridge will be down to single lane alternating traffic. 

Any loads up to 16’ (4.87M)  in width will be permitted to cross through the zone with minimal delay, while loads in excess of 16’ (4.87M) may be required to wait to cross while crews remove their equipment from the structure to accommodate the load.

Dawson Road Maintenance apologizes for any inconvenience this work may cause.

- Dave Lueneberg