• Menu


  • Close
  • Dawson Creek News
  • Regional News
    • Chetwynd
    • Tumbler Ridge
    • Pouce Coupe
    • Alberta Peace
    • BC
    • Cannabis News
    • National
    • International
    • PRRD
    • Site C
    • LNG
    • Agriculture / Livestock
    • 4-H
  • Business
    • World Business
  • Sports
    • Rodeo
    • Rodeo Events
    • Junior Canucks
    • Senior Canucks
    • Minor Sports
    • National Sports
    • Hockey Schedules
  • Arts & Entertainment
    • Celebrity News
  • Opinion
    • Editorial
    • Columnists
    • Letters
    • Send us a letter
  • Community
    • Events Calendar
    • Submit an Event
    • Farmers Market Calendar
    • Auction listings
    • Festivals
    • Hockey Schedules
  • Photos
  • Advertise
  • Contact Us
  • Classifieds
  • Featured BC Careers
  • Peace Region Careers
  • Autos
  • Obituaries
    • View Obituaries
    • Place an Obituary
    • Place an In Memorium
  • Place An Ad
  • Digital Edition
    • Mirror
    • Northern Horizon
  • Classifieds
  • Featured BC Careers
  • Peace Region Careers
  • Autos
  • Obituaries
    • View Obituaries
    • Place an Obituary
    • Place an In Memorium
  • Place An Ad
  • Digital Edition
    • Mirror
    • Northern Horizon

Photo Gallery on Dawson Creek Mirror

Site C Construction - December 2018

Dawson Creek Mirror

February 5, 2019 11:19 AM



A look at Site C dam construction on the Peace River outside Fort St. John, December 2018. BC Hydro Photos
1/13
sitec
Powerhouse and main service bay on the south bank of the Peace River, December 2018.
Photo By bc hydro
sitec
Spillway excavation and powerhouse buttress (foundation) on the south bank of the Peace River, December 2018.
Photo By bc hydro
carousel thumbnail
Contractor laydown and drainage tunnel access on the south bank of the Peace River, with batch plants in background, December 2018.
Photo By bc hydro
carousel thumbnail
Diversion tunnel outlet portal and cofferdams on the north bank of the Peace River, December 2018.
Photo By bc hydro
carousel thumbnail
Inlet portal for the diversion tunnels on the north bank of the Peace River, December 2018.
Photo By bc hydro
carousel thumbnail
The conveyor belt corridor near the dam site. The conveyor will move materials from the 85 Avenue industrial lands to the dam site, and is being built along this right of way, December 2018.
Photo By bc hydro
carousel thumbnail
Concrete being pumped into a coupling chamber at the powerhouse, December 2018.
Photo By bc hydro
carousel thumbnail
Concrete being pumped into a coupling chamber at the powerhouse, December 2018.
Photo By bc hydro
carousel thumbnail
Form lift at the main service bay, December 2018.
Photo By bc hydro
carousel thumbnail
Workers install rebar in the main service bay, December 2018.
Photo By bc hydro
carousel thumbnail
A worker installs rebar at the main service bay, December 2018.
Photo By bc hydro
carousel thumbnail
Concrete truck at one of the on-site concrete batch plants on the south bank of the Peace River, December 2018.
Photo By bc hydro
carousel thumbnail
One of four roadheaders being used to excavate the diversion tunnels, December 2018.
Photo By BC Hydro
Previous Next

Email this article to a Friend

 
* Please separate multiple email addresses with the semi-colon character.
 
  • ahn-online-edition-100x100

    Alaska Highway News

    Online Edition

  • mirror-100x100

    Dawson Creek Mirror

    Online Edition

  • tnh-100x100

    The Northern Horizon

    Online Edition

  • pnn-100x100

    Pipeline News North

    Online Edition

Popular Arts & Entertainment

  • Most Read
  • Most Recent
  • SPCDC workshop on getting babies to sleep goes Wednesday

    February 19, 2019

  • Behind the Lines: a war across the world comes to Mile Zero

    February 15, 2019

  • Free open art studio at Pouce Coupe Community Centre Saturday

    February 15, 2019

  • In the lab with The Alkemist

    February 12, 2019

  • Daddy, daughter dance this weekend!

    February 7, 2019

Sign Up For Our Newsletter!

Have the Dawson Creek Mirror delivered to your inbox every day! You can contact us or unsubscribe anytime.

Dawson Creek Mirror

Sister Newspapers

  • Alaska Highway News
  • Northern Horizon
  • Pipeline News North

Other Sections

  • About Us
  • Contact Us
  • Advertise
  • Northern Horizon rates
  • Newsletter subscribe
  • Policies, Terms and Conditions
  • Road Report
  • YVR Arrivals/Departures
  • YDQ Arrivals/Departures (Dawson Creek)
  • YXJ Arrivals/Departures (Fort St. John)
  • YYE Arrivals/Departures (Fort Nelson)

Connect

  • Facebook
  • Twitter
  • RSS
© Copyright Glacier Community Media